Northlake Kitchen and Bath Remodeling With a Return Visit
We remodel kitchens, bathrooms and whole homes, from relocating a sink drain to rebuilding a shower down to the studs. Every estimate is written line by line. When the job wraps up, we return to see how it has settled and show you how to care for it, in Northlake, Roanoke, Argyle and nearby.
Remodeling Services for Your Home
We handle kitchen remodeling, bathroom remodeling and whole home remodeling. That covers layout changes, plumbing and gas line moves, wall removal with proper framing, subfloor repair, flooring and tile showers. Our work carries a 1-year warranty. Each service page explains its own steps and what affects the price.

Kitchen Remodeling
Layout changes, plumbing and gas moves, appliance circuits, flooring and finish work, followed by a return visit to check the kitchen and show you its care.

Bathroom Remodeling
Shower and tub replacement, waterproofed tile, updated plumbing and ventilation, with a check-back after the job and plain care instructions.
Whole Home Remodeling
Several rooms planned as one project, from wall removal and rough-in to flooring and trim, with a walkthrough and care notes after we finish.
How We Run a Remodel
Most remodels look fine on the last day. The real test is the first few months, when grout cures, wood floors adjust to the air conditioning and fixtures get daily use. We build our process around that window.
- 01
We come back to check the work
A few weeks past completion we return to look everything over. We check grout lines and caulk joints for hairline gaps, test drains and shutoff valves, and look at flooring transitions for movement. Small adjustments are easier to make early.
- 02
Care instructions in plain terms
New materials need different care. Cementitious grout needs a sealer and pH-neutral cleaners, silicone caulk at a tub should not be scrubbed with abrasives, and engineered wood floors do not like wet mops. We walk you through what you have and leave written notes.
- 03
Problems in year one get a visit
Our remodeling comes with a 1-year warranty. If something in that first year looks wrong to you, phone us and we will come look at it.
- 04
Line-item estimates, no lump sums
Your estimate lists demolition, rough plumbing, framing, drywall, flooring, tile and permit costs separately. You can see what each part costs and decide where to spend.
- 05
Photos of what we find
Opening walls and floors sometimes shows a slow leak, a rotted subfloor under a dishwasher or an undersized drain line. We photograph it, explain the cause and give you the repair cost before any extra work starts.

About Kitchen Remodeling Northlake
We are a remodeling company working inside homes in Northlake and the surrounding towns. Our work is kitchens, bathrooms and whole home remodels, and we keep the focus there so each crew knows the sequence well: demolition, rough-in, inspection, close-up and finish.
We started checking back on finished jobs because the problems that matter show up once the crew has left. A tile floor laid over a slab can crack if the slab moves with the clay soil. Caulk can pull away as a house cycles between summer heat and winter heating. Catching that early, and showing you how to maintain new surfaces, keeps a remodel looking right for years.
- Warranty
- 1-year warranty
Where We Work
We are based in Northlake, TX, and take remodeling jobs in Roanoke, Argyle, Justin, Flower Mound, Keller, Trophy Club, Lantana, Haslet, Double Oak and Ponder. Many homes here were built on post-tensioned slabs, and we plan plumbing changes with that in mind.
- Northlake
- Roanoke
- Argyle
- Justin
- Flower Mound
- Keller
- Trophy Club
- Lantana
- Haslet
- Double Oak
- Ponder
If your town is not listed, ask on the phone. Nearby areas are often within reach.

What Sets the Cost of Your Remodel
Square footage tells only part of the story. A remodel's cost depends mostly on which fixtures and walls change position and on the condition of the framing and subfloor once old finishes come out. We look at each of the drivers below during the free quote.
We give a price only after measuring the room in person, and that visit is free. Your written estimate lists every part on its own line, and we explain any change before the work proceeds.
- Relocating drains on a slab
- Most homes in the area are built on a concrete slab. Shifting a sink or toilet drain means saw-cutting the slab, digging a trench, laying new pipe with the correct slope and pouring a concrete patch. Leaving fixtures in their current spots keeps that cost off the estimate.
- Walls and structure
- Taking out a non-load-bearing wall is mainly demolition and drywall patching. A load-bearing wall needs a correctly sized beam and posts, sometimes with an engineer's review, and that adds both days and dollars.
- What sits under the finishes
- A slow dishwasher leak, a seeping toilet flange or a shower pan that gave out years ago leaves soft subfloor and damaged framing. That has to be repaired before any new work goes on top.
- Materials you choose
- Large-format porcelain tile demands a flatter substrate than small tile. Natural stone has to be sealed. Luxury vinyl plank goes down faster than tile. Each choice shifts labor hours along with material cost.
- Permits and inspections
- Changes to plumbing or structure generally require a permit and inspections. We handle the permit and the inspection scheduling, and the fees show up as a separate line on your estimate.
Questions Homeowners Ask Us
- How much does a kitchen or bathroom remodel cost?
- The biggest factors are whether plumbing or walls move, how sound the subfloor and framing are, and which materials you select. We do not give phone prices for a space we have not seen. The quote is free, and the written estimate itemizes each part so you know where your money goes.
- How long will the work take?
- A bathroom that keeps its existing layout generally finishes sooner than one where the shower or drain moves. Kitchens and whole home projects run longer, and inspections add some waiting between stages. Your estimate comes with a schedule, and we tell you promptly if something we uncover affects it.
- Can we stay in the house during the remodel?
- Most families stay put. We close off the work area with plastic sheeting, cover floors along the route in and out, and clean up every day. A kitchen remodel does leave you without a working kitchen for part of the job, so we help you set up a temporary one.
- Who takes care of the permit paperwork?
- We handle it. Plumbing relocations, new framing and similar changes go through the local permit office, and we submit the application and book each inspection at the proper stage. The permit fee is listed separately on your estimate instead of being buried in labor.
- What happens once the job is finished?
- We walk the room with you, explain how to care for each new material and leave written notes. A few weeks later we return to check grout, caulk, drains and flooring transitions. Anything that has shifted or settled gets taken care of at that visit.
- How should I clean new tile and grout?
- Let cement-based grout cure fully, then keep it sealed and use a pH-neutral cleaner. Bleach, vinegar and acidic sprays wear down the sealer and the grout itself over time. Dry off standing water on natural stone. During the walk-through we name the products that suit your room.
- What if hidden damage turns up during demolition?
- Work on that area pauses while we take photos and show you the cause, for example a leaking supply line or a shower pan that failed. You receive the repair cost in writing before anything continues. No extra work happens without your okay.
How a Job Runs, Start to Follow-Up
Here is what happens from the first phone call to the return visit at the end.
- 1
Phone call
You tell us what you want to change and what bothers you about the current space. We set a time to see it.
- 2
Site visit and written estimate
We measure, check under the sink and around the toilet for moisture, and note which walls carry load. Then you get a line-item estimate.
- 3
Permits and protection
We pull any permit the work needs. On day one we lay floor protection, seal doorways with plastic sheeting and set up a clear path in and out of your home.
- 4
Build and inspections
Demolition, rough plumbing and framing come first, then inspections, then drywall, tile and flooring. We clean up at the end of each workday so the rest of the house stays usable.
- 5
Walk-through and return visit
We walk the finished room with you, go over care for each material and leave written notes. A few weeks later we come back to check how everything has settled.
Ready to Plan Your Remodel?
Tell us what you want to change and we will set up a visit. You get a written, line-item estimate and a crew that returns to check the finished work.